Automated route and link integrity checks
- Depends on
- None
- Development hook
- Run before and after every bounded change
DEPENDENCY-ORDERED DEVELOPMENT
Priority follows dependency and risk—not excitement. A later stage may inspire work now, but it cannot claim maturity until its enabling gates are satisfied.
No site improvement may silently alter evidence, governing intents, contributor attribution, or an established Recovery Point.
“Implemented” requires a successful pre-change check, a bounded change, a successful post-change check, and a recoverable release.
NOW
Make every later change recoverable, attributable, and testable.
STAGE GATEA clean build, route inventory, dependency record, rollback point, and named owner exist.
NEXT
Let newcomers and specialists contribute at an appropriate level without flattening differences in evidence quality.
STAGE GATEEvery entry path identifies expected output, evidence burden, privacy boundary, and destination.
THEN
Expose dimensional gaps and correlations without converting visual or statistical proximity into ontology.
STAGE GATEEvery candidate relation retains source, detector, frame, null world, counterexplanation, and confidence history.
LATER
Move from characterization toward safe, bounded manipulation of actual physics in ways not otherwise available.
STAGE GATEPredictions, controls, failure limits, reversibility, safety review, and conventional comparisons are explicit before intervention.
HORIZON
Support global, multi-AI development while preventing one institution, model, vocabulary, or funding source from controlling the commons.
STAGE GATEGovernance, formats, verification, and recovery remain portable across vendors, jurisdictions, and generations.
ACTIVE
Turn registered relationships into reproducible comparison tools without presenting simulations or visual proximity as evidence of Actual Physics.
STAGE GATEEvery run exports its inputs, versions, baseline, null world, assumptions, limits, uncertainty, and failure state; unsafe stages remain blocked.